Quote:
Originally Posted by DaleDe
Anything that has a receiver/transmitter on it requires special certification and testing. This is likely the reason for the delay.
Dale
|
Good point. How complex and lengthy is that process likely to be?
That said I'd have expected most of that to be done much the same time they were going through the EMC and other testing and before going into production.