Quote:
Originally Posted by PeterT
I was actually thinking (if possible) of the two being separate choices; I assumed that within the activity table would be an indication of whether a book was newly added or finished, and was kind of hoping that the ability might exist to remove either of those substates.
|
The Activity table doesn't hold the information. But, I already have the trigger that will do this and can put them as "Finished" and "New" as separate options.