It may not be as simple as suggested. You are connecting one part, search and replace with establishing and checking links. If this step occurs every time, it will slow the program down. The slowdown will be in direct proportion to the number of links existing.
I believe the main body of users would prefer faster to correct at every stage. In fact there was a modification made to allow it to be not correct, so a work at a certain stage but still not valid could be saved.
|